Commercial doors for new buildings

Working with builders, architects and general contractors across Southern and Eastern Idaho, from door schedule through rough opening to final commissioning, on the project timeline.

What we bring to the project

One trade for every opening in the building.

Input at the door schedule stage
Cycle counts, headroom and operator type settled while they are still drawings, which is when changing them is free.
Rough opening coordination
Header, jamb detail and backroom confirmed against the doors actually specified, before the steel or the block goes up.
Electrical and controls coordination
Operator power, control station locations and safety device runs communicated to the electrician ahead of close-in.
Delivery to the construction schedule
We hold doors and install when the openings are ready, rather than storing finished product on an active site.
Commissioning and handover
Doors cycled under load, safety devices tested, and the facility team shown how everything works before you hand over the building.

Where commercial door projects go wrong

The same handful of issues, and all of them are cheaper to prevent than to correct.

Common problems

  • Openings framed before the door schedule is final
  • Headroom that will not take the operator specified
  • Doors specified at residential cycle counts for industrial traffic
  • No power at the operator location at close-in
  • Safety device runs missed before the walls close
  • Finished doors delivered to a site that is not ready for them

What happens on the visit

  • We review the door schedule and flag conflicts early
  • Rough openings confirmed against the actual doors ordered
  • Delivery timed to the site rather than the calendar
  • Doors commissioned under load with safety devices tested
  • The facility team gets a walkthrough before handover
Want a price before you commit to anything? The estimate is free, on site, and there is no obligation to have the work done.

Project questions

When should we bring you in?

At the door schedule stage. Cycle counts, headroom and operator type are free to change on a drawing and expensive to change in steel.

Do you work from architect drawings?

Yes, and we will flag conflicts between the schedule and the openings before they get built.

Can you hold doors until the site is ready?

Yes. Finished doors sitting through an active build pick up damage nobody wants to argue about at handover.

Do you handle fire-rated openings?

Yes, including drop testing and the documentation for the file.

Who commissions the doors at the end?

We do. Doors are cycled under load, safety devices tested, and the facility team is walked through before handover.

More answers on the full FAQ page.

Where we work

Two shops cover most of Southern and Eastern Idaho between them. Call the one closest to you and you reach the shop that sends the truck, not a call center.

Magic Valley & Wood River Valley

Dispatched from the Kimberly shop, 473 Hankins Rd S

(208) 734-4657

Twin Falls, Kimberly, Jerome, Filer, Buhl, Hansen, Wendell, Gooding, Burley, Rupert, Heyburn, Shoshone, Castleford, Hazelton, Eden, Murtaugh, Paul, Declo, Hailey, Ketchum and Bellevue.

Eastern Idaho

Dispatched from the Idaho Falls shop

(208) 273-1557

Idaho Falls, Pocatello, Chubbuck, Blackfoot, Rexburg, Shelley, Ammon, Rigby, Iona, Ucon, Firth, Sugar City, St. Anthony and Menan.

Not on the list? Call and ask. We go further than the map suggests.